ποΈ 9.10: SEO Change Log Management
Phase 9 Β· Reporting, Maintenance & Optimization Β· SOP-P09-10
π― GoalDarek SEO change no record rakhvo, jethi traffic change nu reason mane.
π₯ InputsChange log sheet; ticket/commit links
π§° ToolsGoogle Sheets
Step-by-Step Instructions
9.10.A Aa stop su chhe
SEO ma traffic badlay tyare sauthi pehlo sawal: "Amey su badlyu hatu?" Change log vagar jawab nathi malto. Darek SEO change ek line ma lakhvo.
9.10.B Su lakhvu (columns)
| Column | Example |
|---|---|
| Date | 2026-11-23 |
| URL / Scope | /blog/x ke "site-wide" |
| Change type | Title, Meta, Content, Redirect, Schema, Robots, Internal links, Speed, Design |
| What changed | Title: old to new |
| Why / hypothesis | CTR vadharva (position 5, CTR 1.2%) |
| Owner | Naam |
| Ticket / commit link | GitHub commit ke task link |
| Before metric | 28 divas clicks / position |
| Check date | Date + 28 divas |
| Result | Pachhi bharvu: better / same / worse |
9.10.C Rules
- Change karyo te j divase entry. Pachhi bhule.
- Site-wide change (robots, redirects, theme, schema) alag flag karo: "SITE-WIDE".
- Nana change (ek title) pan lakho.
- Rollback hoy to juni value copy kari rakho.
- Aa sheet tracker (Change_Log tab) sathe sync rahe.
9.10.D Kyare vaparvu
- Traffic drop diagnosis (9.1): change log pehla joyo.
- Monthly report (9.7): "aa mahine shu karyu ane shu result".
- Core update (9.4): update date same samayna change sathe compare.
9.10.E Weekly review (15 min)
- Check date aavi gai hoy tevi entries: result bharo.
- Je worse chhe te rollback ke fix decide karo.
Output
Up-to-date change log
Definition of Done
- Same divase entry
- review date lakhi
- result pachhi bhari